Pirates of the Burning Sea Medium Fore-and-Aft Rig
Edit This EntryRecipe: Medium Fore-and-Aft Rig Labor required: 6 Hours Requirements: Structure required: Advanced Shipyard (Medium) Inputs:
Structure required: Advanced Shipyard (Small) Structure required: Master Shipyard (Large) Structure required: Shipyard (Large Structure required: Shipyard (Medium) Structure required: Shipyard (Small) Doubloons: 180 Outputs:
Mast Hoops: (0/10) Mast Section, Medium: (0/1) Mast Section, Small: (0/6) Rigging: (0/3) Sail, Medium: (0/2) Sail, Small: (0/6) Spar, Medium: (0/2) Spar, Small: (0/6) | |
| Category | Shipwright Materials |
| Image |
![]() |



Comments